Market entry rules · United Arab Emirates · marble, stone and minerals

Twelve things that sit between a quarry and a Gulf project, in order.

A UAE importer, fabricator or consultant wants the licence, the duty line, the test reports and an approved sample settled before it takes the stone. Conformity, green building and building code rules change, so confirm each one with the authority or the consultant before you ship.

  1. Importer of record: the buyer files the declaration under a Dubai Customs business code issued on its trade licence. A licensed clearing agent can file for the owner once the owner authorises it in the customs system. The declaration type depends on whether the goods come from the rest of the world, the GCC, a Dubai free zone or a customs warehouse. Ask for the code before the first invoice.source
  2. Duty: Dubai Customs charges 5 percent of the CIF value, so freight and insurance on heavy stone add to the duty base. In the Harmonized System, blocks and merely cut slabs sit in 2515 (marble, travertine) and 2516 (granite, sandstone), worked stone in 6802, bentonite in 2508 and barytes in 2511. A wrong HS code with no duty lost is fined AED 500, and a classification request costs AED 25 an item.source
  3. Invoice and origin: the buyer uploads the commercial invoice and the certificate of origin to the Foreign Ministry's eDAS system. Since 1 February 2023 invoices of AED 10,000 or more are attested there for AED 150 plus fees (Cabinet Resolution 38 of 2022). Fees unpaid 14 days after the bill of entry add AED 500 per invoice. A shipment discharged at a free zone port needs no attestation.source
  4. Dubai conformity: Dubai Municipality requires identified products to be certified before they are used or sold in Dubai. Its page names cement, glazed glass, steel reinforcement, concrete blocks, low-emitting paints and adhesives, and ceramic tiles under ISO 13006. It does not name natural stone, marble or granite (confirm with the authority whether a project asks for a certificate).source
  5. Test standards: GSO EN 1469 (cladding slabs) and GSO EN 12058 (floor and stair slabs) were approved as Gulf Standards on 1 July 2021. The GCC Standardization Organization lists the European 2015 editions as their source. A specification can name these, other EN standards or ASTM, so ask the consultant which test set the project uses before you cut samples.source
  6. Samples and mock-up: a stone guide specification asks for test reports, samples and an approved site mock-up before the work starts. Samples are two or three per stone and show the range of colour and finish, and the architect approves the mock-up first. It cites ASTM C503 (marble), C568 (limestone) and C615 (granite). It is a North American quarry group's document, so confirm the Gulf steps with the consultant.source
  7. Al Sa'fat: Dubai's green building rules have applied to every new building since 1 March 2014 and were reissued under this name in 2017. The page's certificate table does not name stone and lists no regional or recycled content clause. Its nearest clause is hardscape (304.05), which tests paving blocks and pavement for solar reflectance (SRI). The Dubai Central Laboratory issues the conformity mark certificates.source
  8. Estidama: credit SM-9 of the Pearl Building Rating System (version 1.0, April 2010) counts materials moved 500 km or less to the site. Distance runs from the furthest point of origin, and 10 percent of material cost earns one point and 20 percent two. Air-freighted materials do not count. Greek and Cypriot stone falls outside 500 km (confirm the current edition with the authority).source
  9. Floors: the Dubai Building Code 2021, Part C, sets pendulum test values (BS EN 13036-4) for accessible surfaces. Indoors, dry floors under a 5 percent slope need 15 to 35 and steeper ones 35 or more. Outdoors and in wet areas the values are 35 to 45, or 45 or more on steeper slopes and for street paving, pools and showers. The supplier states the value in PTV units or the material is tested before acceptance.source
  10. Agency law: Federal Law 3 of 2022 replaced the 1981 law on 15 June 2023 and covers distribution and reseller deals as well as agencies. It applies only to written deals registered with the Ministry of Economy. A registered agent keeps a presumption of exclusivity, a fixed term can end at expiry or at will on agreed terms, and arbitration seated outside the UAE is allowed (law firm note; confirm with the Ministry).source
  11. Payment: UAE payment terms were 30 days for years and now stretch toward 60, and listed companies average above 60 days sales outstanding. Letters of credit are still used but are losing ground, and advance and down payments are frequent. Large construction firms tend to stretch terms but normally pay (Allianz Trade profile of all UAE trade; no stone-specific figures).source
  12. Packing: the German insurers' (GDV) container handbook puts granite and marble slabs on A-frames, one or two to a container by cargo mass. Steel frames suit regular runs and squared lumber a one-off. Slabs are strapped to the frame, timber and shoring stop movement, and lashings are only lightly tensioned because slabs are fragile. Open-top containers take half frames.source

Talk to us

Tell us the product and the market you want next.

A thirty-minute call. We will tell you how many buyers that market has, how many of them you qualify for, and what it would take to be meeting them in the second month.

Talk to us