Market entry rules · United Arab Emirates · building products

Twelve things that sit between a building-products maker and a Gulf project, in order.

A UAE distributor, fabricator or contractor usually needs the licence, the conformity certificate, the fire approval and the consultant's approval in place before it takes a building product. Conformity, fire and green building rules change, so confirm each one with the authority or the project consultant before you ship.

  1. Importer of record: the UAE buyer imports under its own trade licence, and its eDAS account at the Foreign Ministry is tied to that licence. Since 1 February 2023 the commercial invoice for goods worth AED 10,000 or more is attested there (Cabinet Resolution 38 of 2022) at AED 150 plus fees, and the certificate of origin uses the same system. Fees unpaid 14 days after the bill of entry add AED 500 per invoice.source
  2. Dubai conformity: Dubai Municipality regulations name products that must be certified before they are used or sold in Dubai. Its Dubai Central Laboratory certifies paints, coatings, adhesives and sealants, cement, glazed glass, steel reinforcement, concrete blocks and ceramic tiles under ISO/IEC 17065, and certified products carry its conformity mark. A client agrees the scheme with the certification section first.source
  3. Abu Dhabi Trustmark: the Quality and Conformity Council gives the Trustmark to products certified under its schemes. The voluntary schemes cover insulation, glazed windows, doors and curtain walls, paints, plasterboard, rebar and fire safe materials. A product no scheme covers applies for Technical Approval. Glazing and insulation certificates support the u-value figures in an Estidama submission.source
  4. ECAS list: MOIAT's regulated list, a PDF created in July 2022, names these building products. Paints and varnishes (Cabinet Resolution 6 of 2016), water fixtures (43 of 2014), lifts (31 of 2014), escalators (2 of 2016) and automatic doors and windows each need a UAE trade licence and an accredited laboratory's test report. It names no cement, insulation or building pipe (confirm the current list).source
  5. Reinforcing steel: Cabinet Resolution 121 of 2023 requires an ECAS certificate (form H) before rebar and billets are sold. It applies to imports and UAE makers alike, free zones included. The maker also shows ISO 9001, ISO 14001 and an EN 15804 product declaration, and each batch carries a digital product passport. Steel plants had 365 days from 16 December 2023 to comply.source
  6. Civil Defence: in Dubai, cladding, façade, fire door, fire duct and pre-insulated products are tested at the Emirates Safety Laboratory. Its Certificate of Conformity goes to Dubai Civil Defence for product registration, and a certificate from another UAE-accredited body can be submitted to the laboratory for assessment (press report of an April 2023 announcement; confirm with the authority).source
  7. Al Sa'fat: since 1 March 2014 Dubai's green building rules have applied to every new building. They were reissued as Al Sa'fat in 2017 and updated in 2020 and 2023. Its clauses name CFC-free insulation to ASTM C578, EN 13165 or EN 13162, low-emitting paints, adhesives and sealants, and glazing tested for thermal transmittance. The Dubai Central Laboratory issues the conformity mark certificates for them.source
  8. Estidama: in Abu Dhabi a private project must reach at least one Pearl and a government funded one at least two. The rating is needed for the building permit. The credits are mandatory or optional and cover water, energy and building materials, among other categories (Abu Dhabi City Municipality, January 2025).source
  9. Consultant approval: in Dubai the consultant should approve the contractor's material submittal before purchasing begins. The specification sets the evidence, and the tender names the materials and the acceptable alternatives. At delivery the site checks the load against the approved submittal, and a changed life-safety product can reopen Civil Defence review (procurement guide; confirm with the consultant).source
  10. Agency law: Federal Decree-Law 3 of 2022 replaced Law 18 of 1981 on 15 June 2023 and covers distribution and reseller deals as well as agencies. A registered agent keeps a presumption of exclusivity. A principal can end a fixed-term deal at expiry or at will on the agreed terms, and arbitration seated outside the UAE is allowed (law firm note; confirm with the Ministry of Economy).source
  11. Duty: the GCC customs union charges 5 percent on foreign goods that enter from outside the Union. It is collected at the first point of entry, and 417 goods are exempt by schedule. Goods imported from a free zone pay it when they leave the zone.source
  12. Payment: UAE payment terms were 30 days for years and now stretch toward 60, and listed companies average above 60 days sales outstanding. Large construction firms tend to stretch terms further but normally pay. Letters of credit are less popular than before but still used, and advance and down payments are frequent (Allianz Trade country profile).source